Project Description

The project consisted of the construction of a luxury housing complex which is located in Baku. The project was owned by Sahar Baglari and TML was the main contractor for the project. Architect of this project was WS Atkins & Partners Overseas.

Scope of Work

Construction of reinforced concrete structural system,

Execution of roof finishing works of the two building;
- Thermal Insulation
- Water Insulation
- Roof Cladding Works (Ceramic Tiles and Metal Tiles)
Installation  of all electrical systems;
- Transformer Substations and MV Switchgear,
- Diesel Generators,
- Main Distribution / MCC / Sub Distribution Boards,
- Lighting,
- Telecommunications,
- Fire Alarm and Protection,
- Earthing and Lightning Protection,
- Low Voltage Systems (cable TV, telephone, security/intruder alarm)
Installation of  all mechanical systems (HVAC, plumbing, sanitation and sewage systems);
- HVAC Systems (heating/air conditioning/ventilation)
- Cold / Hot Water Supply, Storage, Piping
- Sewage System Collection Pipes and Pumps
- Car Park Underground Exhaust and Ventilation
- HVAC Ducting, Insulation, Piping Works
- Boiler Room and Related Works
- Fire Fighting System Pumps and Piping
- Sprinkler System
- Rainwater Drainage
- Swimming Pool Mechanical Works
Execution of all exterior finishing works of the two buildings;
- External Insulation
- Texture Paint
- Aluminum Doors & Windows
- Aluminum Decorative Panels
- GRC and GRP Facade Elements
Client
SAHAR BAGLARI COMPANY
Date of Contract
June, 2006
Date of Completion (Estimated)
September, 2009