The project was the construction of a second bulk berth (Bulk Berth No 2) with a length of 512 m and a loading berth with 196 m length, which are located in Misurata, Libya. Repair of the existing bulk berth (Bulk Berth no 1) was also included in the work scope. The project was owned by Libyan Iron and Steel Company (LISCO) and TML was the main contractor.
Scope of Work
Driving of structural steel piles and construction of concrete deck surface with precast members and cast-in situ concrete,
Partly dismantling and re-instatement of existing slope protection plus supply and installation of additional layers where necessary,
Supplying and installation of marine fittings consisting of bollards, storm bollards, safety rails and guard rails,
Supplying and installation of rubber fenders for existing Bulk Berth No 1, Bulk Berth No 2 and Loading Berth,
Applying cathodic protection to all exposed ferrous members including steel piles,
Supplying and installation of Laser Vessel Docking System,
Supplying and installation of crane rails for existing Bulk Berth No 1 and Bulk Berth No 2,
Execution of all necessary landworks ,electrical and mechanical works stated in the contract regarding the approved projects.