Isolation of LPG system with new 8" valve and purging, isolation of multiproduct system and purging; draining of fire fighting system |
 |
Removal of three loading arms and localized piping and equipment |
 |
Cutting and removal of section of reinforced concrete deck |
 |
Cutting back and removal of damaged pile and installing of 2 new piles |
 |
Reconstructing precast and in-situ reinforced concrete deck |
 |
Installing three new loading arms with the dimension of 6" and 2 nos of 10" diameter, |
 |
Reinstate piping, test and commission all reinstated facilities. |