Project Description
The project consisted of the repair of Misurata Oil Jetty damaged by ship impact.
Scope of Work

Isolation of LPG system with new 8" valve and purging, isolation of multiproduct system and purging; draining of fire fighting system

Removal of three loading arms and localized piping and equipment

Cutting and removal of section of reinforced concrete deck

Cutting back and removal of damaged pile and installing of 2 new piles

Reconstructing precast and in-situ reinforced concrete deck

Installing three new loading arms with the dimension of 6" and 2 nos of 10" diameter,

Reinstate piping, test and commission all reinstated facilities.

Date of Contract
February, 2008
Date of Completion (Estimated)
October, 2009
Client
Brega Petroleum Marketing CO.