Project Description

The project was the reconditioning of the Jetty 2, which accommodates 150.000 DWT Tankers and services as loading berth for Tobruk Refinery of Arabian Gulf Oil Company.

Scope of Work

Each segment of the Jetty 2,

Demolishing the trunkway and jetty neck concrete deck and replace all with prefabricated reinforced concrete deck elements,
Repairing the deck concrete of jetty head,
Overhauling and painting of 4 nos of  loading arms on the jetty head,
Renewal of concrete supports of loading pipes on the jetty head,
Demolition and reconstruction of 5 reinforced concrete mooring dolphins,
Repairing of piles under  mooring dolphins,
Replacement of capstans on mooring dolphins,
Renewal of wooden and rubber fenders on breasting and mooring dolphins,
Renewal of buffer and hinge system of breasting dolphins,
Grit blasting and painting of all steel structures,
Renewal of lighting system,
Replacement of all fastening elements of steel structures,
Renewal of HDG cable trays and cable tray supports,
Replacement of all gratings and handrails.

Shore approach, Jetty 1 & Jetty 2,

Removal of existing fire fighting system,

Designing a new fire fighting system for both jetties suitable for tankers with 300 m hull length,
Installation of new fire fighting system with GRE pipes,
Sand blasting and painting of 34" loading, 24" blast and 6" recovery oil lines of the whole jetty,
Sand blasting and painting of all piles of the whole jetty parts.
Client
AGOCO
Date of Commencement
November, 2008
Date of Completion
August, 2010