The project consisted of the special surface treatment and injection to the damaged concrete surfaces of nearly 100,000 sq.m. on the Dry Dock to be used in the Shah Deniz Gas Export Project.
Scope of Work
The repair of inner walls, beams, soffits, ceilings and top deck of concrete floating dry dock.
Total 50,000 sq. m area was repaired successfully. Fosroc Renderoc BF and HS material was used as repair material.