Misurata Berths Project |
Marine Works in Mostaganem |
Offshore Works Of Doha Plant |
Jetty 2 at Tobruk Terminal |
Construction of Bulk Berth No.2 and Loading Berth |
Repair Works of LISCO in Libya |
Jetty at Tobruk Terminal |
Repairing of The Berths No.15-33 at Tripoli Harbor |
Abu Taraba Desalination |
Breakwater Crown Wall |
Foça WWTP& Sea Outfall |
Misurata Oil Jetty Project |
Misurata Steel Harbour |
|
Foça WWTP& Sea OutfallFoca Wastewater Treatment Plant and Sea Outfall Facilities Client : Municipality of Foça, Izmir, Turkey Main Contractor . TML-Çevtas JV - Pridesa Consortium Key Designer : TML-Çevtas JV - Pridesa Consortium Consultant : Tugal-Tistaş JV Start Date : January 2002 Finish Date : January 2004 Key features of Work Scope: Treatment Plant was designed for a flow of 14.083 m³/day Sea Outfall was designed as 3300m with Ø 500 mm HDPE Pipe including 110m diffusers. The Project was the construction and operation of Wastewater treatment Plant with a 3410 m long 500 mm diameter Sea Outfall Facilities of Foça city. Scope of work included; · Construction of process structures for treatment plant, · Construction of supporting structures, all process pipelines, · Excavation and filling works for the above works, · Surface finishes, · Supply and installation of all mechanical and electrical works of the treatment plant, · Civil, mechanical and electrical works, · Modification of five pump stations, · Operation of the treatment plant for a year.
|