Misurata Berths Project |
Marine Works in Mostaganem |
Offshore Works Of Doha Plant |
Jetty 2 at Tobruk Terminal |
Construction of Bulk Berth No.2 and Loading Berth |
Repair Works of LISCO in Libya |
Jetty at Tobruk Terminal |
Repairing of The Berths No.15-33 at Tripoli Harbor |
Abu Taraba Desalination |
Breakwater Crown Wall |
Foça WWTP& Sea Outfall |
Misurata Oil Jetty Project |
Misurata Steel Harbour |
|
Repair Works of LISCO in LibyaRepair Works of LISCO Berth in progress
Client : LISCO – Libyan Iron and Steel Co. Key Designer : Optimum Engineering Start Date : September 2019 Key features of Work Scope: TML achieved substantial progress in repair of the damage to the LISCO Bulk Berth 1 due to ship crashing, Misurata, Libya
|