Misurata Berths Project |
Marine Works in Mostaganem |
Offshore Works Of Doha Plant |
Jetty 2 at Tobruk Terminal |
Construction of Bulk Berth No.2 and Loading Berth |
Repair Works of LISCO in Libya |
Jetty at Tobruk Terminal |
Repairing of The Berths No.15-33 at Tripoli Harbor |
Abu Taraba Desalination |
Breakwater Crown Wall |
Foça WWTP& Sea Outfall |
Misurata Oil Jetty Project |
Misurata Steel Harbour |
|
Marine Works in MostaganemMarine Works Involved in Mostaganem Combined Cycle Power Plant Client : Sonelgaz Algeria Key Designer : Samsung C&T. Start Date : May 2017 Key features of Work Scope : The scope of project is installation of cooling water intake pipelines (5 ea. x 2.000 m; HDPE with Ø2,500 mm) including precast concrete intake head structures as well as discharge unit for 1.450 MW Combined Cycle Power Plant Project at Mostaganem, Algeria.
|